Construction Site Risk Assessment

CONSTRUCTION SITE RISK ASSESSMENT


ADMINISTRATION

Ensure the following is in place. Tick only if relevent.

WORKERS

These hazards have been identified , considered and addressed by the following

HAZARDS

These hazards have been identified , considered and addressed by a Safe Work Method Statement

SPECIFIC RISK

These risks MUST be controlled by inclusion in your SWMS (if applicable). If the answer is NO. Please update your SWMS and place the new controls in the comment box below

YesNoN/A
Erection and placement of frames and trusses
Working at heights
Working with mobile plant and machinery (crane, bobcat etc)
Working with ladders, access to roof, ladders in place and secured
Electrical hazards have been assessed
Installing roof iron / tiles
Asbestos has been assessed
Scaffold/s in place, Scaftag attached
Panel Lift pre-start conducted
Trestles and planks are secure and on a level surface.
Sign Here